Eight component families covering the electrical, structural, decorative and installation side of a complete fixture. The specs below are our standard production range; special sizes can be made to drawing. MOQ and lead times are indicative and confirmed on each quotation.
Specifications above are our standard production range. Stock, price and lead time move with raw material markets — the quotation reply governs.
The expensive mistake in component buying is that two parts look the same and are not. These are the parameters we confirm item by item before quoting — and the ones we flag on the quotation itself.
| Category | Parameters to confirm | Common mismatch risk | Standard MOQ | Lead time |
|---|---|---|---|---|
| Lamp Holders | Holder type, base material, heat rating, rated current, wiring method | Bakelite used with high-wattage lamps deforms and carbonises | 500 pcs | 3 days from stock |
| LED Drivers | Output current/voltage, wattage, dimming method, PF, IP rating | Constant-current drift causes flicker and lumen decay; protocol mismatch with the dimmer | 100 pcs | 5–10 days |
| Metal & Structure | Alloy grade, sheet or wall thickness, tolerance, finish, salt spray | Thinner sheet weakens the load rating; thin plating rusts early | Assessed per drawing | Samples 3–7 days |
| Crystal & Glass | Material (K9/acrylic), size, facet count, hole diameter, transmission | Hole size does not match the wire; batch-to-batch colour and clarity drift | 1000 pcs | 7–15 days |
| Suspension Systems | Cable diameter, breaking load, adjustment travel, canopy size | Chosen on looks, ignoring fixture weight — cannot be levelled on site | 500 sets | 5–8 days |
| Smart Modules | Protocol, supply voltage, load limit, pairing method, app ecosystem | Overload burns the module; protocol does not talk to the client's gateway | 200 pcs | 2 days proposal / 12 days production |
| Packing & Fittings | Insert structure, stacking layers, drop test requirement, markings | Weak fixturing causes transit damage and a higher return rate | Per container | 5–7 days |
Standard parts carry a minimum per category. New-model trials can be mixed across categories, and the combined quantity is priced at the volume tier.
Stock samples are free of charge for standard parts. Custom samples carry a fee, credited in full once the agreed production quantity is reached. The signed sample is the acceptance standard.
Deposit on order, balance before shipment. Established accounts can apply for monthly terms under an agreed supply contract.
Tell us the fixture type, destination market and expected monthly volume. We come back with a component selection and a cost range — free, and without pushing the most expensive option.